Scrolling and Flashing Message Example
Dear Esteemed Customer, ZESCO Limited informs you of the temporary reduction of the available national power generation by 150 Megawatts from 20-27 October 2024 to facilitate urgent corrective maintenance on a generating unit at Maamba Energy Limited. During this period, ZESCO will strive to maintain the 3 hours of supply to residential customers. Thank you for your understanding.

Projects and Planning

The Projects and Planning Directorate at ZESCO embodies the forward-thinking approach essential for ensuring Zambia's energy sustainability and uninterrupted service delivery. Their focus on ongoing infrastructure rehabilitation and upgrades forms the cornerstone for maintaining a consistent and fault-resistant power supply. With a commitment to strategic planning, this Directorate spearheads the crucial task of envisioning, developing, and replacing vital infrastructure. By prioritizing upgrades and proactive development initiatives, ZESCO ensures the seamless evolution of its infrastructure to meet the nation's growing energy demands while guaranteeing reliable service continuity.

LIST OF PROJECTS

PROJECT TITLE DESCRIPTION Location
100MW ITEZHI-TEZHI SOLAR PV PLANT To increase national electricity generation capacity by exploiting the Solar power potential on the proposed Itezhi-tezhi PV site area in Itezhi-tezhi. ITEZHI-TEZHI
100MW KANONA SOLAR PV PLANT To increase national electricity generation capacity by exploiting the Solar power potential on the proposed Kanona PV site area in Serenje. KANONA
1200MW COAL-FIRED POWER PLANT IN PARTNERSHIP WITH EDM OF MOZAMBIQUE AND POWER CHINA To increase generation capacity in Mozambique, Zambia, Malawi and SAPP in general. SAPP
150 MW WIND POWER PLANT To increase national electricity generation capacity by exploiting the Wind power potential on the proposed Chinka site area in Nakonde. NAKONDE
330KV KABWE STEPDOWN - PENSULO TRANSMISSION LINE NO. 2 To provide security of supply to Eastern, Northern, Luapula and Muchinga provinces. KABWE
75MW MUZUMA SOLAR PV PLANT To increase national electricity generation capacity by exploiting the Solar power potential on the proposed Muzuma PV site area in Choma. To improve the energy mix of the country's electrical power supply CHOMA
BATOKA GORGE HYDROPOWER PROJECT, 1200MW To increase national electricity generation capacity by exploiting the hydro power potential on the Zambezi River. LIVINGSTONE
CENTRAL CORRIDOR TRANSMISSION NETWORK REINFORCEMENT Between Lusaka and Kabwe; To increase the power transfer capacity to the copper belt and across the border to SNEL. To increase the Power Transfer capacity to the increasing mining loads in Northwestern Province and the proposed Kalumbila/Kansanshi - Kolwezi/Panda interconnector. To provide power transfer capacity for the ZTK interconnector corridor. To increase the SAPP/EAPP power trading capacity through the ZESCO network. To provide a South - North transmission corridor for the Kafue Gorge lower 750MW power plant. KABWE - LUSAKA
CHISHIMBA FALLS 15MW HYDRO SCHEME To increase generation capacity for supply to Kasama and surrounding areas. KASAMA
CONNECTION OF LUANGWA TO THE GRID To replace the expensive, unreliable and inadequate capacity diesel generation supply at Luangwa by connection to the National Grid. To facilitate increased access to electricity in Luangwa and Rufunsa districts residents RUFUNSA
CONNECTION OF LUNDAZI AND CHAMA TO THE NATIONAL GRID To connect Lundazi and Chama districts to the Zambian grid in order to improve quality and access to electricity for the said areas. LUNDAZI
CONNECTION SUBSIDY FEE PROGRAM To facilitate subsidized connections country wide COUNTRY-WIDE
Euro Bond Funded Projects To improve distribution network capacity of the distribution network in Lusaka and Copperbelt areas LUSAKA & COPPERBELT
EVACUATION OF POWER FROM 15MW LUSIWASI UPPER POWER PLANT To provide an evacuation path for the new 15MW Lusiwasi hydro power plant LUSIWASI
IMPROVEMENT OF POWER SUPPLY TO MPIKA DISTRICT To secure power supply for Mpika as well as stabilize the long 330 kV transmission line from Pensulo to Kasama. To provide evacuation path for new generation planned in the area. LUSAKA & COPPERBELT
Euro Bond Funded Projects To improve distribution network capacity of the distribution network in Lusaka and Copperbelt areas MPIKA
Increased Access to Electricity Service (IAES) - (ESAP) To increase electricity access in targeted rural and peri-urban areas and enhance the enabling environment for accelerated electrification in Zambia RURAL
Increased Access to Electricity Service (IAES) - (JICA), DISTRIBUTION LINES PHASE II To improve access to electricity in rural areas by constructing distribution lines, related facilities thereby improving living standards of local residents including the poor and promoting economic and social development country wide RURAL
Increased Access to Electricity Service (IAES) - (LAST MILE) To improve access to electricity by constructing distribution lines in Lusaka area. LUSAKA
INTENSIFICATION & GRID EXTENSIONS To carry out various works involving provision of new service connections, installation of new lines and associated transformers country wide COUNTRY-WIDE
KABWE 200MW SOLAR PROJEC To increase national electricity generation capacity by exploiting the Solar power potential on the proposed PV site area in Kabwe District. KABWE
KAFUE GORGE LOWER HYDRO SCHEME, 750MW To create new national generation capacity for supply to the national grid. KAFUE GORGE LOWER
KAFUE GORGE LOWER 200MW SOLAR PROJECT To increase national electricity generation capacity by exploiting the Solar power potential on the proposed PV site area downstream of KGL in Chirundu District. KAFUE GORGE LOWER
KAFUE GORGE LOWER POWER EVACUATION To facilitate evacuation power from Kafue Gorge Lower Power station. KAFUE GORGE LOWER
KAFUE TOWN - MUZUMA - VICTORIA FALLS 220KV TRANSMISSION LINE UPGRADE PROJECT To increase the transmission capacity in the southern corridor. To facilitate the connection of MCL Thermal power plant. To increase electricity trade in the southern sub region LIVINGSTONE
KAKONKO FALLS 8MW HYDROPOWER PROJECT Contribute power to Kawambwa District in Northern Province and to the national grid and thus assist in mitigating power shortfall in the country KAKONKO FALLS
KALEPELA 4MW HYDROPOWER PROJECT Contribute power to Mporokoso District in Northern Province and to the national grid KALEPELA
KARIBA 200MW SOLAR PROJECT To increase national electricity generation capacity by exploiting the Solar power potential on the proposed PV site area. KARIBA
KARIBA LAKESHORE/ BOTTOM ROAD ELECTRIFICATION PROJECT To electrify Lake Kariba Shore areas in Siavonga, Gwembe and Sinazongwe districts of Southern Province. SIAVONGA
KASAMA - NAKONDE 330KV TRANSMISSION LINE. To secure power supply to Muchinga Province. To facilitate the development of the ZTK interconnector to connect to the East Africa power pool. To provide Power evacuation path from the proposed Kalungwishi and Lufubu rivers hydro power schemes. KASAMA
LUAPULA RIVER HYDRO SCHEME 600MW To increase national electricity generation capacity by exploiting the hydro power potential on Luapula River. LUAPULA
LUNZUA 14.8MW HYDRO SCHEME To increase electricity supply to support Northern Circuit tourism initiative. LUNZUA
LUSAKA EAST MFEZ. To supply the Lusaka East Multi Facility Economic Zone (MFEZ) LUSAKA
LUSAKA SOUTH MFEZ 330KV TRANSMISSION PROJECT. To supply the Lusaka South MFEZ. To reinforce the 132kV Lusaka ring under the LTDRP project. To provide for the evacuation path for Bangweulu and Ngonye solar plants. To provide an evacuation point for Kafue Gorge Lower hydro plant (750MW). LUSAKA
Lusaka Transmission and Distribution (LTDRP) Project Lusaka Transmission and Distribution (LTDRP) Project LUSAKA
LUSIWASI LOWER 86MW HYDRO SCHEME. To increase generation capacity for supply to Muchinga, Northern, and Eastern provinces. LUSIWASI
LUSIWASI UPPER 15MW HYDRO SCHEME. To create new generation capacity for supply to Muchinga, Northern, and Eastern provinces. LUSIWASI
MUMBURUMA 8MW HYDROPOWER PROJECT. Contribute power to Mporokoso District in Northern Province and to the national grid MUMBURUMA
MUSONDA FALLS 10MW HYDRO SCHEME. To increase generation capacity at Musonda Falls for supply capacity to Luapula province. MUSONDA FALLS
MWASHA FALLS 5MW HYDROPOWER PROJECT Contribute power to Nsama District in Northern Province and to the national grid. MWASHA FALLS
NAMUNDELA 4.8MW HYDROPOWER PROJECT Contribute power to Shiwan'gandu District in Muchinga Province and to the national grid NAMUNDELA
PENSULO-MANSA 330KV TRANSMISSION PROJECT. To increase the transmission capacity to Luapula Province to support future large-scale mining and agricultural loads. To provide an evacuation path for the hydropower schemes on the Luapula River. PENSULO-MANSA
POWER SUPPLY TO KASOMPE SUBSTATION IN CHINGOLA Increase capacity and security of supply to Chingola District. KASOMPE-CHINGOLA
REINFORCEMENT OF SUPPLY TO LIVINGSTONE TOWN- PHASE 1 To reinforce the power supply system to Livingstone town and surrounding areas LIVINGSTONE.
SHANGOMBO 1MW SOLAR/ DIESEL PROJECT To introduce a hybrid system for generation in Shangombo thereby reducing the cost of operating the diesel generators currently in Shangombo district. SHANGOMBO
SOLWEZI - KOLWEZI FEASIBILITY STUDIES To improve the security & reliability of the power networks and to foster economic development and regional integration and trade. SOLWEZI - KOLWEZI
Sustainable Electricity Supply Southern Division (SESSD) project To improve security of supply & reliability of the distribution network in Central, Southern, Eastern and Western Provinces SESSD
WEST LUNGA II 40MW HYDROPOWER PROJECT Contribute power to Mwinilunga District in Northern Western Province and to the national grid. WEST LUNGA
ZAMBIA MOZAMBIQUE FEASIBILITY STUDIES To improve the security & reliability of the power networks and to foster economic development and regional integration and trade. ZAMBIA MOZAMBIQUE
ZIZABONA INTERCONNECTOR PROJECT To facilitate increased regional trading in the SAPP network. ZIZABONA
ZTK Phase 2 To improve the security & reliability of the power networks and to foster economic development and regional integration. ZTK

Disclosure of the Environmental and Social Impact Assessment, Environmental and Social Management Plan, Environmental and Social Commitment Plan, Stakeholder Engagement Plan, and Labour Management Procedure for the Zambia Tanzania Interconnector Project

The Regional Energy Transmission, Trade and Decarbonization (RETRADE) Platform is the World Bank (WB) response to support countries in the Eastern and Southern African Region in enhancing energy security, resilience, and a transition toward a low-carbon energy sector. The Government of the Republic of Zambia (GRZ), through the Ministry of Energy (MoE), will therefore, implement the RETRADE Project through the Zambia Tanzania Interconnector Project (ZTIP), with the involvement of ZESCO Limited, as set out in the Financing Agreement. The International Development Association has agreed to provide financing for the Project, as set out in the referred Agreement. The ZTIP comprises the following components:

  • i. Construction of 380km of 330kV single-circuit transmission line between the Pensulo and Kasama Substations;
  • ii. Construction of 230km of 330kV double-circuit transmission line from Kasama to Nakonde;
  • iii.Construction of a 330/66kV Substation in Nakonde;
  • iv Construction of 15km of 330kV double-circuit transmission line from Nakonde to the Zambia – Tanzania border; and
  • v. Construction of 12km of 132 kV double circuit transmission line from Nakonde to Isoka (loop in and out of 66 kV Isoka - Nakonde line);
  • vi. Establishment of ±250MVAr Dynamic Voltage Support Devices at Pensulo and Nakonde Substations.

The Environmental and Social Impact Assessment (ESIA) for the ZTIP was approved by the Zambia Environmental Management Agency (ZEMA) in March 2024. As a requirement by the World Bank, the ESIA and Environmental and Social Management Plan (ESMP) for the ZTIP have been updated to conform to the World Bank’s Environmental and Social Framework (ESF). Additionally, as part of the Environmental and Social Safeguards (ESS) Instruments of the ESF, ZESCO developed the following Safeguards Instruments, namely, an Environmental and Social Commitment Plan (ESCP), a Stakeholder Engagement Plan (SEP), and a Labour Management Procedure (LMP).

The ESIA and ESMP identify and assess the environmental and social risks and impacts of the Project throughout the project life cycle and propose measures and actions to manage the identified risks and impacts.

The ESCP sets out material measures and actions that ZESCO shall carry out or cause to be carried out on the project, including, as applicable, the timeframes of the actions and measures, institutional, staffing, training, monitoring and reporting arrangements, and grievance management.

The SEP, on the other hand, outlines ways in which ZESCO shall communicate with various stakeholders affected by the ZTIP and the feedback mechanisms to be utilized.

The LMP identifies the main labour requirements and risks associated with the Project and determines the resources necessary to address the Project labour issues.

Under the Financing Agreement with the World Bank, it is a requirement to disclose the ESIA, ESMP, ESCP, SEP, LMP and other ESS instruments such as the Resettlement Action Plan (RAP) and Biodiversity Management Plan (BMP) on the ZESCO website to ensure public awareness and participation during Project implementation. Disclosed here are the ESCP, SEP, LMP, and draft ESIA and ESMP reports for the ZTIP.

S/n Document Title Actions
1
ESIA Volume 1-Main Report - Zambia Tanzania Interconnector Project-Preliminary Version 2
2
ESIA Volume 2-Appendices - Zambia Tanzania Interconnector Project-Preliminary Version 2
3
ESMP Volume 1-Main Report - Zambia Tanzania Interconnector Project-Preliminary Version 2
4
ESMP Volume 2-Appendices - Zambia Tanzania Interconnector Project-Preliminary Version 2
5
Stakeholder Engagement Plan - Zambia Tanzania Interconnector Project
6
Labour Management Procedure - Zambia Tanzania Interconnector Project
7
Environmental and Social Committment Plan - Zambia Tanzania Interconnector Project