Scrolling and Flashing Message Example
Dear Esteemed Customer, ZESCO Limited informs you of the temporary reduction of the available national power generation by 150 Megawatts from 20-27 October 2024 to facilitate urgent corrective maintenance on a generating unit at Maamba Energy Limited. During this period, ZESCO will strive to maintain the 3 hours of supply to residential customers. Thank you for your understanding.

Transmission Operations and Trade

The Transmission Operations and Trade (TOT) Directorate at ZESCO takes charge of overseeing the transmission assets and serves as the system operator for the Interconnected Power System (IPS). Alongside managing power trading both nationally and regionally, this Directorate operates the National Control Centre (NCC), utilizing advanced automated monitoring and control systems to effectively run the IPS. ZESCO's electricity infrastructure spans Zambia, interconnecting with the national utilities of Zimbabwe, Botswana, Namibia, Tanzania, Malawi, and the Democratic Republic of Congo (DRC), fostering a broad regional network for power distribution and trade.